So far I’ve framed the canyon area and made a rough design plan for the bridge. Now I’m starting to rough in the scenery.

First I put down a couple pieces of foam core board to be the riverbed and sketched out outlines of the shore.

Then I cut some 2-inch bead board to fit these lines and the outline of the bench work (I’m going to need to start thinking about fascia material soon!).  I use a hot knife and a hot wire cutter to do all my cutting.

Once I had these flat pieces secured I cut some profile pieces to establish the high points.

Now I need to get some rock castings going.

Comments are closed.