Sun 24 May 2009
Nick’s next railroad part 1
Posted by Daniel Swearingen under second mirco layout[2] comments / Leave a comment
Having had so much fun with our first micro layout, Nick wanted to move on to something more ambitious. After pouring over my 30 year stack of Narrow Gauge & Shortline Gazettes, Nick wanted to do a small lumber layout and we chose On30.
Bachmann On30 Porter 0-4-0s can negotiate a 12″ minimum radius and Nick wants a large trestle.
I had an idea but was having a hard time describing it to Nick so I made a quick planning model in 1/8″ = 1″ scale. The footprint is 30″ x 4 feet long and about 4 feet tall.
I made a pencil sketch to show how the bridge would look.
The lower back will have room for a separate small town/logging camp area. We may do this in HO scale.
We labeled lots of the construction dimensions on the planning model so it’s acting as kind of a 3D blueprint.
The frame is made of 3/8″ x 4″ plywood planks ripped on the table saw and connected with 2×2 blocks glued and screwed. We added casters so it is easy to roll around.
Next we built up the sides and made an oval of plywood as the roadway.
We’ll cut away the portion that will be spanned by the bridge.